Concept

Deficiency List

A running list of incomplete, non-conforming, or substandard work identified by quality control staff during construction itself, distinct from the punch list compiled specifically near the end of the project for the owner's final walkthrough.

Why it matters

Catching and tracking a deficiency while the relevant trade is still actively on site, rather than waiting until a final punch walk months later, means it can usually be fixed immediately and cheaply; the same issue left until closeout often requires remobilizing a trade that's already moved on to another project.

On a real project

A QA/QC inspector notices improperly spaced anchor bolts during a mid-project walk and adds the issue to the deficiency list immediately, getting it corrected the same week while the steel erector is still actively on site, rather than letting it sit undiscovered until the final punch list walkthrough months later when remobilizing that crew would cost far more.

Who this matters most to

The QA/QC Inspector maintains the deficiency list throughout construction, flagging issues as they're found, and the Quality Control Manager tracks deficiency trends across trades to catch a systemic quality problem early.

Where this goes wrong

A project relies entirely on the final punch list to catch quality issues, without an ongoing deficiency list during construction itself, and discovers problems only after the responsible trade has already demobilized and left the site, making the same fix far more expensive to arrange.