Fragnet (Schedule Fragment)

A small, self-contained piece of schedule logic, a handful of new or modified activities with their own durations and relationships, inserted into an existing schedule to model the time impact of a specific change, like a design revision or an added scope item.

Why it matters

Rather than rebuilding an entire schedule from scratch to evaluate one change, a fragnet isolates just that change's activities and logic, which makes it the standard building block for a formal delay or time-impact analysis, since it shows precisely how much time the specific change actually added.

On a real project

An owner issues a late design change requiring additional structural reinforcement. The scheduler builds a fragnet modeling the new reinforcement activities and their logic ties to the existing schedule, then inserts it to calculate exactly how many days that specific change pushes back the project's finish date.

Who this matters most to

The Scheduler builds the fragnet representing a change's added activities and logic ties, and the Scheduling Delay Consultant uses the resulting fragnet as the core evidence in a formal delay claim.

Where this goes wrong

A party claims a change caused a certain number of days of delay without building an actual fragnet showing the added activities and their logic ties into the existing schedule, leaving the claim without the structured evidence a delay analysis actually requires.