Lead-Based Paint Remediation
CSI Division 02, Existing Conditions
Under the EPA's Renovation, Repair and Painting (RRP) Rule, any work that disturbs painted surfaces in housing or child-occupied facilities built before 1978 -- when lead-based paint was banned -- must be performed by an EPA lead-safe certified firm using specific containment and cleanup practices, unless testing proves the paint isn't lead-based.
Why it matters
Lead dust created by sanding, cutting, or demolishing painted surfaces is a serious health hazard, especially for children, and the RRP Rule makes using certified, lead-safe practices a legal requirement rather than a best practice on covered buildings.
On a real project
A contractor renovating a kitchen in a 1960s house uses plastic sheeting to contain the work area, wet-sands rather than dry-sands the old trim, and HEPA-vacuums the debris, documenting the lead-safe practices required because the home predates the 1978 ban.
Who this matters most to
A Environmental Remediation Specialist or Safety Manager confirms RRP certification is current and containment practices are followed before renovation work begins on a pre-1978 structure.
Where this goes wrong
A remodeling crew dry-sands painted trim in a pre-1978 home without confirming the paint's lead content or using RRP-required containment, spreading lead dust through the home's ventilation system and triggering a costly re-cleaning and disclosure obligation.