Progressive Design-Build
A design-build delivery variant where the owner selects a single design-build team early, based on qualifications, and then negotiates design, scope, and price progressively as the design develops, rather than competitively bidding a complete design-build price up front.
Why it matters
It gives the owner more influence over design decisions and more flexibility to adjust scope as the project develops, compared to a traditional lump-sum design-build competition where the price is locked in before design has really started.
On a real project
A hospital system selects a design-build team for a new wing based on qualifications and relevant experience alone, then works with that team through schematic design before agreeing on a guaranteed maximum price, rather than having several teams compete on a fixed design-build price before design work has even begun.
Who this matters most to
The Preconstruction Manager leads the progressive pricing and scope development that distinguishes this delivery method from a traditional design-build competition, and the Owner's Representative manages the owner's side of the ongoing negotiation as design and price develop together.
Where this goes wrong
An owner treats a progressive design-build selection the same way as a traditional competitive design-build bid, comparing early-stage proposals on price alone, when the method is built around qualifications-based selection followed by collaborative price development.