RFI Log
A tracking document listing every RFI submitted on a project, its date, who it was sent to, its due date, and whether and when it was answered, the working tool behind the broader RFI process.
Why it matters
An unanswered RFI sitting past its due date is often the quiet cause of a field delay nobody notices until it's already too late, so the log's real value is surfacing overdue RFIs before the work waiting on an answer actually stalls out.
On a real project
A project engineer reviews the RFI log every Monday and finds three RFIs from the mechanical subcontractor sitting unanswered past their due dates. Following up with the design team that day gets answers back before the mechanical crew actually reaches the point where they need that information to keep working.
Who this matters most to
The Project Engineer maintains the RFI log and chases overdue responses, and the Document Control Specialist keeps the log itself current and accessible to the whole project team.
Where this goes wrong
A project tracks RFIs informally through email threads rather than a proper log, and nobody notices a critical RFI sitting unanswered for weeks until the subcontractor waiting on that answer finally stops work and files a delay claim.