Trade Permits (Electrical, Mechanical, Plumbing)
The separate permits, beyond the general building permit, typically required for electrical, mechanical (HVAC), and plumbing work, each reviewed against its own trade-specific code and usually requiring its own licensed trade inspector to sign off before that system can be closed in or turned on.
Why it matters
A general contractor can have a fully permitted building permit and still be in violation if the electrical, mechanical, or plumbing scope proceeds without its own separate trade-specific permit and inspection.
On a real project
A remodel's building permit covers the overall structural work, but the electrician and plumber each pull their own separate trade permits before starting rough-in, since the local jurisdiction inspects electrical and plumbing work against the National Electrical Code and plumbing code independently of the general building inspection.
Who this matters most to
Project managers should track trade permits as their own separate line items in the schedule, since a missing electrical or plumbing permit can hold up a rough-in inspection even when the general building permit is in perfect order.
Where this goes wrong
People sometimes assume one building permit covers all the work happening under it, when most jurisdictions require electrical, mechanical, and plumbing scopes to each be permitted and inspected separately by their own trade-specific inspector.
Explore next