Underground Storage Tank (UST) Removal
CSI Division 02, Existing Conditions
The excavation and removal of a buried fuel or chemical storage tank, regulated under EPA rules (40 CFR Part 280) that require at least 30 days' advance notice to the regulating agency before permanent closure, along with soil testing to check for leaks.
Why it matters
Older USTs can corrode and leak contaminants into soil and groundwater; removal, rather than abandoning a tank in place, is the only way to inspect it directly and confirm whether contamination needs to be addressed before the site can be redeveloped.
On a real project
Before redeveloping a former gas station site, a contractor excavates and removes three old steel USTs, and the required soil sample at the excavation reveals contamination that triggers a remediation plan before construction can proceed.
Who this matters most to
A Environmental Remediation Specialist manages the removal, required notifications, and any contamination follow-up, while a Project Manager builds the regulatory timeline into the project schedule.
Where this goes wrong
A contractor begins excavating a UST without submitting the required 30-day closure notice, and the regulating agency halts the work, delaying the entire site redevelopment while the paperwork catches up.