Audiovisual Systems
CSI Division 27, Communications
Built-in projection, display, and conference-room video/audio equipment, along with the structured cabling and power that feed it, planned early enough that the right conduit and blocking get built into walls and ceilings before they're closed up.
Why it matters
Retrofitting a projector mount, a recessed screen, or AV cabling into a finished ceiling or wall is far more disruptive than roughing it in during construction, so AV design has to be locked in before drywall rather than treated as a furniture-style addition after occupancy.
On a real project
A contractor building a corporate conference room installs blocking in the ceiling for a motorized projector screen and runs the AV cabling conduit before the ceiling grid goes in, coordinating exact locations with the AV integrator's layout.
Who this matters most to
An Electrician runs AV power and low-voltage cabling, and the Construction Technology Manager coordinates the AV integrator's rough-in requirements with the rest of the MEP trades.
Where this goes wrong
AV blocking and conduit are skipped because the AV integrator hasn't been selected yet when the ceiling closes in, and the eventual projector mount has to be surface-run with exposed conduit instead of the clean, concealed installation that was planned.