Infection Control Risk Assessment (ICRA)
A formal, written assessment, required by the Joint Commission and most state health departments for construction or renovation inside an occupied healthcare facility, that rates the infection-control risk of the work and specifies the containment measures (barriers, negative-air machines, HEPA filtration, air pressure monitoring) the project has to use before it starts.
Why it matters
Ordinary construction dust is mostly a cleanup problem. In a hospital, the same dust can carry mold spores or bacteria directly into the air that immunocompromised patients breathe, so the containment has to be engineered and verified in advance, not improvised once work is already underway.
On a real project
Before cutting into a ceiling two floors above an oncology unit, the project team completes an ICRA that rates the work as high-risk given its proximity to immunocompromised patients, requiring sealed construction barriers and continuously monitored negative-air pressure for the duration of the work.
Who this matters most to
A Healthcare Construction Manager develops and enforces ICRA procedures for every phase of work near clinical areas, coordinating directly with the hospital's own infection control staff before anything starts. A Safety Manager on a healthcare project verifies containment barriers and air pressure monitoring stay in place and functioning throughout construction, not just on day one.
Where this goes wrong
A crew sets up dust barriers for a ceiling renovation but doesn't maintain negative air pressure continuously, since the monitoring equipment keeps tripping a false alarm and gets unplugged to stop the noise. Airborne particulates drift past the barrier into an adjacent patient corridor for several days before anyone notices the monitor was disconnected, triggering a hospital-wide infection control investigation.