Laboratory Equipment
CSI Division 11, Equipment
Fixed lab equipment, fume hoods, biosafety cabinets, emergency eyewash/shower stations, and specialized casework, installed as part of the building rather than brought in afterward, each tied to dedicated exhaust, plumbing, or power that has to be coordinated during construction.
Why it matters
A fume hood or biosafety cabinet is only as safe as the exhaust system behind it; if the ductwork, makeup air, and exhaust fan aren't sized and balanced correctly for that specific hood, it won't actually protect the people using it.
On a real project
A contractor installing a fume hood in a new chemistry lab coordinates its dedicated exhaust duct and fan sizing directly with the mechanical engineer's design, rather than tying it into a shared exhaust system sized for general ventilation.
Who this matters most to
A MEP Engineer designs the dedicated exhaust and makeup air for each piece of lab equipment, and the QA/QC Inspector verifies face velocity testing before the lab is turned over.
Where this goes wrong
A fume hood gets tied into a shared exhaust system to save ductwork cost, and the hood's face velocity test fails once other equipment on the same system is running, since the shared exhaust can't deliver what one hood alone needs.
Explore next