Phasing Plan
A plan dividing a construction project into distinct sequential or overlapping phases, each defining what work happens where and in what order, used specifically on projects where parts of a facility stay occupied or operational while other parts are under construction.
Why it matters
Building in an occupied hospital or a school that stays in session is fundamentally different from building on an empty site, since the phasing plan has to account for maintaining life safety, access, and operations in occupied areas while construction proceeds in adjacent phases, not just sequencing the construction work itself.
On a real project
A hospital renovation project's phasing plan divides the work into four sequential phases, each one renovating a different wing while keeping the other three wings fully operational, with temporary partitions, dedicated construction access routes, and infection-control measures specific to each phase's boundary with occupied space.
Who this matters most to
The Superintendent executes the phasing plan in the field, maintaining the required separation between construction and occupied areas, and the Owner's Representative coordinates the phasing plan's schedule against the owner's own operational needs in each phase.
Where this goes wrong
A renovation project's phasing plan sequences the construction work logically but doesn't adequately account for the occupied building's life-safety and access requirements in each phase, creating a code or operational conflict that isn't discovered until a specific phase is already underway.