Total Float vs. Free Float

Two different ways of measuring schedule cushion: total float is how long an activity can slip without delaying the whole project's finish date, while free float is the smaller amount it can slip without delaying the very next activity that depends on it.

Why it matters

An activity can have plenty of total float but zero free float, which means delaying it won't push back the project finish date, but it will still immediately push back whoever's scheduled to start right after it, a distinction that matters a lot to whichever trade is next in line.

On a real project

A rough-in electrical activity has ten days of total float before it threatens the project's finish date, but zero free float, since the drywall crew scheduled to start the moment electrical finishes has no float of its own. Delaying electrical by even one day pushes the drywall start, even though the overall project schedule absorbs it fine.

Who this matters most to

The Scheduler tracks both total and free float on every activity, since a trade foreman who only hears "you have ten days of float" from the overall schedule might not realize the very next crew in line has none.

Where this goes wrong

A foreman assumes an activity with plenty of total float can safely slip a few days with no consequence, without realizing the next trade queued up behind it has zero free float and gets pushed back immediately as a result.