Concept

Ice Rinks

CSI Division 13, Special Construction

Refrigerated concrete slabs with embedded piping that circulates a chilled brine or glycol solution to freeze and maintain an ice surface, requiring specialized refrigeration equipment and a structural slab designed around the embedded piping grid.

Why it matters

An ice rink's refrigeration piping has to be embedded in the slab during the pour with exact spacing for even freezing, which means the refrigeration contractor's layout has to be finalized and coordinated before concrete work begins, not after.

On a real project

A contractor pouring a rink slab coordinates the refrigeration contractor's embedded piping grid and leveling tolerances with the concrete subcontractor before the pour, since the piping can't be added or adjusted once the slab is cured.

Who this matters most to

A MEP Engineer designs the refrigeration system and piping layout, and the Concrete Worker places and finishes the slab around the embedded grid to the tight flatness tolerance ice surfaces require.

Where this goes wrong

A rink slab is poured slightly out of level, and once refrigerated, the uneven surface creates thin spots in the ice that crack under skater traffic, requiring the surface to be built back up before the rink can open.